§ 32-7-404. BUILDING ENGINEER TO REFER APPLICATION TO THE COMMISSION.  


Latest version.
  • (a)

    Required. Within 5 days after receipt of an application (excluding Saturdays, Sundays, and legal holidays) for a permit as required under § 32-7-403 of this subtitle, the Building Engineer shall forward to the Commission:

    (1)

    The application; and

    (2)

    All plans and specifications relative to the application.

    (b)

    Commission requirements.

    (1)

    All plans, elevations, and other information considered necessary by the commission to determine the appropriateness of the proposed excavation, removal of an exterior architectural feature, construction, alteration, reconstruction, moving, or demolition of any structure shall be made available to the Commission.

    (2)

    The Commission may not take action on any application until it determines that the application is complete and includes all necessary plans, elevations, and other information as required in this section.

(1988 Code, § 26-544) (Bill No. 112-02, § 2, 7-1-2004; Bill No. 26-07, § 3, 4-29-2007)