§ 13-10-103. NOTIFICATION OF ASBESTOS REMOVAL PROJECTS.


Latest version.
  • (a)

    Application. This section applies to a person doing asbestos abatement or removal work whether the person is licensed or not licensed by the state to perform asbestos abatement or removal work.

    (b)

    Required. A person shall notify the Department, in writing, at least 3 days before beginning any asbestos abatement or removal project.

    (c)

    Contents. The notification required under this section shall include the location of the project and the approximate amount of asbestos-containing material to be removed or encapsulated.

    (d)

    Emergency situations.

    (1)

    The minimum 3-day prior notice requirement may be waived if an emergency situation exists which can be substantiated to the Department.

    (2)

    In an emergency situation, the person shall give the notice to the Department as soon as possible before beginning abatement or removal work.

    (e)

    Enforcement. The Director may enforce the provisions of this section in accordance with Article 3, Title 6 of the Code.

(1988 Code, § 14-2) (Bill No. 173, 1989, § 3, 1-26-1990; Bill No. 105-00, § 2, 7-1-2004; Bill No. 82-06, § 4, 8-24-2006)